Lane Widening Of Kajang Silk Highway (SILK PHASE 2)


We were awarded the surveillance camera system works for a highway project, covering two scopes: temporary solar-powered CCTV for construction monitoring and permanent PTZ CCTV systems with associated infrastructure works. The system was successfully integrated with Lembaga Lebuhraya Malaysia (LLM) to support real-time highway monitoring and traffic safety.

Facebook
Twitter
LinkedIn
Pinterest

Get In Touch!